Active
25257-S Étude de faisabilité des actions correctives des pertuis 12 et 13 et de la construction d'un pertuis supplémentaire au barrage Sartigan
✨
Quick Summary
A feasibility study is sought for corrective actions on sluices 12 and 13 and for the construction of an additional sluice at the Sartigan dam in Quebec. The project involves assessing potential solutions to improve dam operations and safety.
Ideal For
Engineering firms specializing in hydraulic infrastructure and dam construction should consider bidding.
civil engineeringhydraulic engineeringdam constructionfeasibility studywater management
High complexityTender Details
- Reference Number
- ocds-ec9k95-20124441
- Publication Date
- Feb 17, 2026
- Closing Date
- Mar 17, 2026