OpenServices

South Coaldale Regional Storm Water Management Facility – Detailed Design and Construction Administration Services

Description

The successful Proponent will outline the team of professionals available to perform the following scope of work: a) The detailed design will be based on the preferred design of constructing a retention pond (wet pond) as outlined in the Malloy Drain Stormwater Improvements Feasibility Assessment (2023). The full scope of work is not limited to, but may encompass the following:  Project Management.  Review and be familiar with the existing reports / materials associated with the project includ

Tender Details

Reference Number
AB-2024-08886
Publication Date
Oct 11, 2024
Closing Date
Oct 31, 2024