OpenServices

Reynolds Museum - Concrete Floor in Storage Building

Description

Engineering and construction of a 60 x 180 ft (18.28 x 54.86M) concrete floor slab for an existing storage building with a concrete driveway approach pad outside of the existing front building overhead door 18 x 20 ft (5.48 x 6.1m) • Subgrade preparation requires all organic material to be removed from slab area. • Minimum of 6” (15.25 cm) of compacted ¾” (20mm) minus crushed stone aggregate subbase. • Contractor will be responsible for all sub-base grading and aggregate placement. • Layer of m

Tender Details

Reference Number
AB-2026-03516
Publication Date
May 4, 2026
Closing Date
May 25, 2026