SUMMARY OF WORK: The major items of work include the following approximate quantities: 1. General requirements including mobilization, de-mobilization and survey layout etc. 2. Remove and dispose 34m of existing 200mm dia. Storm Sewer 3. Remove and dispose of 5 v.m of existing 2 Manholes including Frame and Covers 4. Remove and dispose of 1 existing Curb & Gutters 5. Remove and dispose of 3,928m3 existing Asphalt (100mm-120mm depth) 6. Remove and dispose of / re-use 7,858m3 existing GBC (up to 3