OpenServices

DRUMHELLER COURTHOUSE Installation of a Stand – By Electrical Generator

Description

Installation of a new 250 kW exterior natural gas standby generator housed in a pre-manufactured walk-in enclosure on a new concrete pad at the south side of the Courthouse. Work includes new electrical distribution equipment (main distribution panel, automatic transfer switch, and transformer), new service feeders from the existing ATCO utility transformer, modifications to the natural gas service and meter, and all associated mechanical, electrical, and structural works.

Tender Details

Reference Number
AB-2026-05380
Publication Date
Jul 29, 2026
Closing Date
Aug 27, 2026