Closed

Carseland Diversion Headgates Sandblasting, Recoating, and Replacement of Seals

Description

PROJECT OVERVIEW a) Project Background-The Provincially owned Carseland Bow Headworks System provides an essential secured water supply for irrigation, industrial, municipal and domestic uses throughout the Bow and Oldman River drainage basins. This water supply system is valued at over $1 billion and is critical to support the local economy, provide safe drainage and flood control and ensure a secured water supply for the Bow River Irrigation District and 300,000 Acres of irrigated crop land. b) Project Objectives- The Contractor will deliver the Services through Mechanical service technicians, QA/QC, and industry-standard reporting to Agriculture & Irrigation. The selected contractor will be responsible for the Sandblasting, recoating and installing new bottom seals on 3 radial gates. c) Project Structure/Business Model- Operation and maintenance for this project is delivered from the Vulcan WIOB field office with management and technical support provided from the Calgary office. The area maintenance and operations Team Lead is located in Vulcan, and reports to the Bow Basin Operations & Infrastructure Manager located in Calgary, AB. d) Key Stakeholders - The stakeholders and beneficiaries of this project include the Bow River Irrigation District (BRID), numerous private irrigators located throughout Southern Alberta, municipalities and industry who rely on this conveyance system to provide a secured water supply, directly supporting the local economy and the public of Alberta. e) Related Project Documents - Gate drawing will be provided as part of this RFP.

Tender Details

Reference Number
AB-2025-05285
Publication Date
Aug 15, 2025
Closing Date
Sep 11, 2025

Contracting Entity

Agriculture and Irrigation

Regions of Delivery

AB