ExpiredGoodsAmended (5x)

Replacement, Installation, Testing and Commissioning of Supersonic Nozzle Jack Stations Controls

Remplacement, installation, mise à l’essai et mise en services des commandes des stations de vérin de la tuyère supersonique

Description

This project is required in order to continue the safe and reliable operation of the 1.5 m Tri-Sonic wind tunnel facility. The existing motors and controls used for the positioning of the supersonic nozzle (SSN) have deteriorated to the point that they are now at a very high risk of failure. These positioning systems use 24 separately controlled motors (Figures 1-3) to configure the profile of the wind tunnel’s flexible supersonic nozzle in order to generate the required Mach number for a blowdown. Several components used in these systems have already failed and have either been disconnected or bypassed. Due to the age of these systems, direct replacement components are no longer available and it is not possible to make repairs to the existing equipment. This has resulted in reduced functionality of the systems and there is a growing risk that more of the components will begin to fail, which will cause the system to be no longer operational. In addition, these legacy motor control systems date from the original wind tunnel installation (c.1960), and therefore do not meet the requirements of the present day Canadian Electrical code. One of the recommendations included in the Electrical Condition Assessment report issued by Jp2g Consultants Inc., in September of 2016, was that these controls should be replaced as soon as possible. The aging cabling infrastructure is also an electrical and safety concern. The 1.5 m wind tunnel facility replaced the cabtyre power feeds that run directly from the motor control centers to the junction boxes with Teck90 cable in 2017, however there still exists cabtyre power feeds that run from the junction boxes to the control cubicles in the field that are in poor condition and require attention. Additional benefits which will be achieved through the implementation of modern controls is the increased efficiency of the wind tunnel and mitigation of any risks of human error which could lead to potentially dangerous tunnel conditions that could cause damage to either the wind tunnel systems or client models. Primary goals of the project: 1. To remove all of the electrical hazards that are present in the current motor control system ensuring that the new installation meets all applicable codes; 2. To improve the operational reliability of the system; 3. To ensure that the systems specified are compatible with the future plans of the facility and are capable of providing closed-loop, automated control of the supersonic nozzle setting.

Quick Summary

The National Research Council of Canada (NRC) is seeking services to replace, install, test, and commission new control systems for the supersonic nozzle jack stations of their 1.5 m Tri-Sonic wind tunnel facility. The existing motor controls are outdated, failing, and no longer repairable, posing a risk to safe and reliable operation. The project aims to modernize these systems to meet current Canadian Electrical Code standards and ensure continued functionality.

Ideal For

Companies specializing in industrial motor control system upgrades and electrical system modernization should bid.

wind tunnel equipmentmotor control systemsindustrial automationelectrical engineeringtesting and commissioning
High complexity

Tender Details

Reference Number
cb-225-45577419
Solicitation Number
25-58009
Publication Date
Jun 5, 2025
Closing Date
Jul 25, 2025
Procurement Method
Competitive - Open bidding
Selection Criteria
Lowest Price
Notice Type
Request for Proposal

Classification

UNSPSC Code
41100000
UNSPSC Description
Laboratory and scientific equipment

Trade Agreements

World Trade Organization Agreement on Government Procurement (WTO GPA); Canada-Honduras Free Trade Agreement; Canada-European Union Comprehensive Economic and Trade Agreement (CETA); Canada-Ukraine Free Trade Agreement (CUFTA); Canadian Free Trade Agreement (CFTA); Canada-Peru Free Trade Agreement (CPFTA); Canada-Panama Free Trade Agreement; Canada-Colombia Free Trade Agreement; Canada-UK Trade Continuity Agreement (Canada-UK TCA); Comprehensive and Progressive Agreement for Trans-Pacific Partnership (CPTPP); Canada-Korea Free Trade Agreement (CKFTA); Canada-Chile Free Trade Agreement (CCFTA)

Contracting Entity

National Research Council of Canada (NRC)

1200 Montreal road

Ottawa, Ontario

Contact

Kacendra Dion

Kacendra.Dion@cnrc-nrc.gc.ca

(438) 324-8125

Regions of Delivery

Ontario (except NCR)