ExpiredServicesAmended (1x)

Porcupine River and Fishing Branch River Salmon Assessment Technical Support - Multi-year 2025-2027.

Soutien technique pour l’évaluation des saumons de la rivière Fishing Branch et de la rivière Porcupine - projets pluriannuels 2025-2027.

Description

The Porcupine River Salmon Assessment project estimates the passage of Chinook and Chum salmon in the Porcupine River near Old Crow. The Fishing Branch River Chum Salmon Assessment estimates escapement of Chum salmon to the Fishing Branch River through use of a weir. Both projects take place within the Traditional Territory of the Vuntut Gwitchin First Nation (VGFN) and within the lands subject to the Vuntut Gwitchin First Nation Final Agreement (1993). The Porcupine River camp is located on VGFN Land (R block R-1A) and the Fishing Branch River camp is located within the Ni’iinlii ’Njik Wilderness Preserve on VGFN R-05A Settlement Land. Porcupine River Sonar DFO and VGFN work in partnership to deliver this stock assessment project. The project involves using sonar technology to enumerate fish passage and includes a test-netting component to capture and sample migrating fish. The project is staffed by three fisheries technicians. Fisheries and Oceans Canada provides two of these technicians and VGFN provides a third technician who contributes local technical and logistical support. VGFN may provide a fourth technician for the purposes of training/backup. Annually the specific days of service provided will occur between June 1 and October 31, subject to change by the contracting authority. Fishing Branch River Weir/Sonar A weir was operated to enumerate the return of fall chum salmon to the Fishing Branch River during the periods of 1972-1975, 1985-2012 and in 2015. In 2016-2024 the weir was operated in conjunction with the use of ARIS sonar for enumeration at the site. A weir and sonar counting system will be used again in 2025, along with a video counting box, if possible. A field crew typically consists of 2 or 3 people, with 3 people providing a significant advantage during periods of high workload. A third crew member is extremely beneficial for facilitating the installation of the weir and preparation and takedown of the sonar site, which has daily duties including strenuous lifting of heavy tripods, weir panels, and sandbags within a variable swift water environment. Annually the specific days of service for this project will occur within August 1 and October 31.

Quick Summary

The Department of Fisheries and Oceans (DFO), in partnership with the Vuntut Gwitchin First Nation, is conducting a multi-year salmon assessment project from 2025 to 2027. The project uses sonar technology and test-netting to estimate Chinook and Chum salmon passage in the Porcupine and Fishing Branch Rivers, located within traditional VGFN territory in Ontario.

Ideal For

Companies specializing in fisheries science, environmental monitoring, and technical field support should consider bidding.

Environmental ConsultingFisheries AssessmentWildlife MonitoringSonar TechnologyField Research Services
High complexity

Tender Details

Reference Number
cb-516-23490441
Solicitation Number
30007005
Publication Date
Jun 26, 2025
Closing Date
Jul 14, 2025
Expected Start
Jul 21, 2025
Expected End
Nov 30, 2025
Procurement Method
Advance contract award notice
Selection Criteria
Not applicable
Notice Type
Advance Contract Award Notice

Classification

UNSPSC Code
70101701
UNSPSC Description
Fishing technology services

Trade Agreements

None

Contracting Entity

Department of Fisheries and Oceans (DFO)

200 Kent Street

Ottawa, ON

Contact

Louise Martel

louise.martel@dfo-mpo.gc.ca

(819) 962-7325

Regions of Delivery

Yukon