Open

*Pre-Qualification Required The Work generally comprises of: Removal of the existing asphalt concrete pavement, separate sidewalk, lane aprons, and concrete curb, followed by the excavation to design

Description

*Pre-Qualification Required The Work generally comprises of: Removal of the existing asphalt concrete pavement, separate sidewalk, lane aprons, and concrete curb, followed by the excavation to design subgrade, the installation of concrete surface works including rolled face curb and gutter, separate sidewalk, commercial lane aprons, and standard curb and gutter, and the supply and placement of landscaping tie-ins (topsoil and sod), granular base course, and hot mix asphalt concrete pavement. The

Tender Details

Reference Number
SK-3