OpenConstruction

Installation of Sanitary Stack Cleanouts

Description

Installation of sanitary stack cleanouts to service kitchen drainage on floors two, six, and eight in Murdoch Manor. Cleanouts will need to be accessible from common area hallways with lockable access hatches large enough to allow for cleaning processes. Contractor will be required to provide all necessary materials and parts as well as oversee drywall cutting and repairs for access hatches. All access locations to be determine onsite with preliminary walk through.
✨

Quick Summary

This project involves installing sanitary stack cleanouts for kitchen drainage on multiple floors at Murdoch Manor. The contractor must provide materials, manage drywall modifications for access hatches, and determine exact access points during an onsite walkthrough.

Ideal For

Plumbing and construction companies experienced in sanitary system installations and building modifications should bid.

plumbingsanitary systemsconstructionbuilding maintenancedrywall repair
Moderate complexity

Tender Details

Reference Number
AB-2024-08392
Publication Date
Sep 16, 2024
Closing Date
Oct 7, 2024