OpenConstruction

WWTP SECONDARY CLARIFIER UPGRADES

Description

Request for Qualifications (RFQ) Major work items for this contract will include the demolition and installation of the following general items: Travelling Bridge Scraper Assembly (2 Clarifiers) Running rails, including stops, rail joining materials, fastenings and anchor bolts Cog wheels, Limit switches, including secondary safety system, Anti-derail protection, Bridge drive, Control panel - bridge-mounted in NEMA 4X stainless steel enclosure, Sludge collection components, including underca
✨

Quick Summary

This project involves upgrading secondary clarifiers at a wastewater treatment plant, including demolition and installation of key components such as travelling bridge scraper assemblies, running rails, cog wheels, limit switches, and control panels. The work focuses on mechanical and electrical upgrades to improve the clarifiers' operation and safety systems.

Ideal For

Companies specializing in wastewater treatment plant mechanical and electrical equipment installation and upgrades should consider bidding.

Wastewater TreatmentMechanical InstallationElectrical SystemsIndustrial EquipmentConstruction
High complexity

Tender Details

Reference Number
AB-2024-08396
Publication Date
Sep 16, 2024
Closing Date
Oct 7, 2024