Description
Basic high-level scope is to: o Install a drywall wall (with sound insulation) basically cutting 1327 permanently in half, giving the existing hallway door for 1327 C & D. o Installation of 2 walls and a Door for an office. o Removal of westly divider wall to accommodate removal of block wall in stairwell for access to 1327 A & B. o Installation of Door Frame and Door from the stairwell. o Finishes to match existing. Leaving sink and cabinets in place. Specifications and Drawings attached to
✨
Quick Summary
Portage College's Cold Lake Campus requires modifications to classroom 1327, including installing drywall partitions with sound insulation, creating new office walls and doors, and adjusting existing walls and stairwell access. The work also involves matching finishes to the current design while maintaining existing fixtures like sinks and cabinets.
Ideal For
Companies specializing in interior construction and renovation, particularly those experienced with drywall and partition installations, should bid.
ConstructionInterior RenovationDrywall InstallationCarpentryDoor InstallationAcoustic Insulation
Moderate complexityTender Details
- Reference Number
- AB-2024-08587
- Publication Date
- Sep 25, 2024
- Closing Date
- Oct 25, 2024
Related Tenders
Supply and Planting of Boulevard and Park Trees
Closes: Feb 17, 2026
2026 IRP Dearness Drive Reconstruction
Closes: Feb 18, 2026
Skylight Refurbishment at Glen Abbey Community Centre
Closes: Feb 17, 2026
Brookfield Road Drainage Improvements
Closes: Feb 11, 2026
Cleaning and Re-lamping Sports field Lights at Various Parks
Closes: Feb 17, 2026