OpenConstruction
Cold Lake Provincial Park Site Preparation
Description
1. Mobilization 2. Remove ten existing buildings and tanks from the campground, ensure site is free of all debris, and assist with setting up safety fence if deemed necessary by Parks representative. The tanks are concrete, approximately twelve feet by ten feet by six feet. The contractor will have to be able to break out the existing tanks and haul the debris approximately 8km to a dumpsite. Alberta Parks will ensure the tanks are empty. 3. Excavate new locations and backfill old locations whi
✨
Quick Summary
This project involves site preparation work at Cold Lake Provincial Park, including the removal of ten existing buildings and large concrete tanks, debris cleanup, and excavation for new locations. The contractor will also assist with safety fencing if required by the Parks representative. Alberta Parks will ensure tanks are empty before removal, and debris must be hauled approximately 8 km to a dumpsite.
Ideal For
Companies specializing in demolition, excavation, and site cleanup with equipment capable of handling large concrete tank removal should bid.
site preparationdemolitionexcavationwaste haulingenvironmental cleanup
Moderate complexityTender Details
- Reference Number
- AB-2024-08617
- Publication Date
- Sep 26, 2024
- Closing Date
- Oct 25, 2024
Related Tenders
Supply and Planting of Boulevard and Park Trees
Closes: Feb 17, 2026
2026 IRP Dearness Drive Reconstruction
Closes: Feb 18, 2026
Skylight Refurbishment at Glen Abbey Community Centre
Closes: Feb 17, 2026
Brookfield Road Drainage Improvements
Closes: Feb 11, 2026
Cleaning and Re-lamping Sports field Lights at Various Parks
Closes: Feb 17, 2026