OpenConstruction

Bridge File 8525, Demolition, Bridge Culvert Installation and Other Work

Description

Work shall include the supply and installation of a new bridge culvert structure over a Tributary to Maskwa Creek, located 4.7 km west of Brightview (NW 12-46-26 W4M). The Contractor shall install a twin 1.80 m diameter CSP culvert by 31 m invert length as per the Design Sketches and Section 18 of the Standard Specifications for Bridge Construction. The culvert will be located on a 25 degree LHF skew to the local road, centered at Station 5+555.00. The Scope of the Work includes, but is no

Tender Details

Reference Number
AB-2026-02943
Publication Date
Apr 14, 2026
Closing Date
Apr 28, 2026