OpenConstruction

Lethbridge Polytechnic Campus EST4 Fire Alarm Upgrades

Description

This project intends to complete the migration of the existing fire alarm network from an EST3 copper network to an EST4 fibre network. The main fibre backbone loop has already been installed under a previous phase. This phase of work includes the replacement of the existing fire alarm control panels, installation of conduit and patch cabling to the existing fire alarm fibre interconnection cabinets, connection of each new EST4 panel to the fibre network, and programming and verification of all

Tender Details

Reference Number
AB-2026-02987
Publication Date
Apr 15, 2026
Closing Date
May 5, 2026