OpenConstruction
Bridge File 74671 Bridge Culvert Installation and Other Work
Description
Work shall include the supply and installation of a new bridge culvert over a tributary to Egg Creek, located 5 km northeast of Wostok (SW 23-56-17-W4M). The Contractor shall install a 1.8 m diameter CSP culvert by 30 m invert length as per the Design Sketches and Section 18 of the Standard Specifications for Bridge Construction. The culvert will be located 35-degree RHF skew to the local road, centred at Station 5+557.500. The Scope of the Work includes, but is not limited to, the follow
Tender Details
- Reference Number
- AB-2026-03422
- Publication Date
- Apr 30, 2026
- Closing Date
- May 14, 2026
Related Tenders
Supply and Planting of Boulevard and Park Trees
Closes: Feb 17, 2026
2026 IRP Dearness Drive Reconstruction
Closes: Feb 18, 2026
Skylight Refurbishment at Glen Abbey Community Centre
Closes: Feb 17, 2026
Brookfield Road Drainage Improvements
Closes: Feb 11, 2026
Cleaning and Re-lamping Sports field Lights at Various Parks
Closes: Feb 17, 2026