OpenConstruction

Bridge File 8836 Bridge Culvert Installation

Description

Work shall include the supply and installation of a new bridge culvert over Blueberry Creek, located 8 km northeast of Leslieville (SE 18-40-4-W5M). The Contractor shall install a 2.7 m diameter CSP culvert by 28 m invert length as per the Design Sketch and Section 18 of the Standard Specifications for Bridge Construction. The culvert will be located on a 9-degree RHF skew to the local road, centred at Station 5+550.000. The Scope of the Work includes, but is not limited to, the followin

Tender Details

Reference Number
AB-2026-03565
Publication Date
May 5, 2026
Closing Date
May 19, 2026