OpenConstruction

Double Seal Coat - Range Road 275 – Highway 39 to CPKC Rail Crossing

Description

Work at this site includes the application of the double seal coat layer finished with a final fog coat layer. Roadway surface shall be double seal coated as well as fog coated for the full width of the pavement commencing at Highway 39 to the end of existing pavement excluding the railway crossing south of Buford. Without limiting the special provisions and the Contract, the scope of work at this site shall include but is not limited to following: • Mobilization • Traffic Accommodation includin

Tender Details

Reference Number
AB-2026-03751
Publication Date
May 14, 2026
Closing Date
Jun 4, 2026