OpenConstruction

NPP 26-056 Engineering Services for Bonnybrook Wastewater Treatment Plant Headworks Expansion

Description

The project will design and construct a new headworks facility at Bonnybrook Wastewater Treatment Plant (BBWWTP) located where the old headworks building was. The City is seeking engineering consulting services to evaluate and select the most suitable screening and grit removal options, including associated equipment and sub-systems; determine the required preliminary treatment capacity with consideration for future expansion; and advance the conceptual design.

Tender Details

Reference Number
AB-2026-03786
Publication Date
May 14, 2026