OpenConstruction

Range Road 185 Road Upgrades

Description

Approximately 0.40 km in length of road reconstruction. These improvements include but are not limited to: Regrading of the Roadway and Ditches, Removal / Replacement / Installation of Fencing, Installation of Erosion Control Measures, Subgrade Preparation, Gravel Surfacing, Topsoil Placement and Seeding, Removal and Reinstallation of Existing Signs, and New Sign Installation.

Tender Details

Reference Number
AB-2026-03821
Publication Date
May 15, 2026
Closing Date
Jun 3, 2026