OpenConstruction

PEACE RIVER – CORRECTION CENTRE MAIN BUILDING Unit 3 Sewer Line Repair

Description

Selective demolition of slab and wall for access; hazardous materials abatement; removal of existing sanitary and storm piping; excavation and re-establishment of pipe bedding; installation of new sewer and storm systems; backfill and slab reinstatement; and restoration of floor finishes and wall assembly in accordance with the drawings.

Tender Details

Reference Number
AB-2026-04515
Publication Date
Jun 16, 2026
Closing Date
Jul 9, 2026