OpenConstruction

2026 Walking Trail Rehabilitation

Description

*Pre-Qualification Required The Work generally comprises of dewatering, existing walking trail and associated base course removal, topsoil removal and replacement, excavation to the design subgrade elevation, hauling and disposing of waste material, subgrade preparation, the supply and placement of the required materials, including but not limited to granular base course, CombiGrid, or an approved equal, and asphalt concrete pavement as well as all other items deemed related to or incidental to

Tender Details

Reference Number
AB-2026-04670
Publication Date
Jun 22, 2026
Closing Date
Jul 9, 2026