ExpiredConstructionAmended (2x)

Replacement of pedestrian bridge at St. Clair National Wildlife Area

Remplacement d’un pont piétonnier à la Réserve nationale de faune de St. Clair

Description

Title: Replacement of pedestrian bridge at St. Clair National Wildlife Area Location: St. Clair National Wildlife Area (SCNWA) Pain Court, Ontario N0P 1Z0 Two Phase Selection Process: This is the first phase (Phase One) of a two-phase competition. The first phase will evaluate the qualifications of all bidders. The second phase, (Phase Two), will invite the qualified bidders to provide a financial bid on the project based on the specifications and drawings. Upon award of a contract in Phase Two, the pre-qualification list resulting from the first phase will expire and will not be used in any other solicitation. Work Description: PURPOSE Replacement of a pedestrian bridge at St. Clair National Wildlife Area (SCNWA) located on federal land and subject to federal regulations. OBJECTIVE: Environment and Climate Change Canada has a requirement to replace a pedestrian bridge. The work will require: 1. obtaining a permit under the Canada Wildlife Act(CWA) https://www.canada.ca/en/environment-climate-change/services/national-wildlife-areas/permits-activities/protected-areas/application-permit-under-wildlife-area-regulations.html 2. obtaining a permit under the Species at Risk Act(SARA) https://splep-saraps.az.ec.gc.ca/; 3. completing a Department of Fisheries and Oceans (DFO) Request for Review and obtaining authorization to move forward with proposed work https://www.dfo-mpo.gc.ca/pnw-ppe/reviews-revues/request-review-demande-d-examen-003-eng.html , etc.) ; and 4. providing all necessary labour, materials, and equipment, and appropriate environmental mitigation measures required to remove existing pedestrian bridge and replace with a new pedestrian bridge at the St. Clair Unit of the St Clair National Wildlife Area, located in Pain Court, Ontario N0P 1Z0. 5. a biologist to assist with permit preparation and to be on site during construction to ensure that mitigation measures are implemented as outlined in permits. Environment Canada will lend support/guidance to contractor on permit applications. Estimated Value: To assist with bonding and insurance requirements, this project is estimated to cost approximately between $350,000.00 and $450,000.00 (taxes excluded). Documents may be submitted in either official language of Canada.
✨

Quick Summary

Environment and Climate Change Canada is seeking qualified bidders to replace a pedestrian bridge at the St. Clair National Wildlife Area in Pain Court, Ontario. The project involves a two-phase selection process, starting with qualification evaluation and followed by a financial bid phase. The work requires obtaining permits under the Canada Wildlife Act and the Species at Risk Act.

Ideal For

Companies specializing in bridge construction and environmental compliance with experience in federal permitting should bid.

Bridge ConstructionEnvironmental PermittingCivil EngineeringWildlife ConservationInfrastructure Replacement
High complexity

Tender Details

Reference Number
cb-790-23771543
Solicitation Number
5000082112
Publication Date
Jul 24, 2024
Closing Date
Aug 15, 2024
Expected Start
Oct 1, 2024
Expected End
Mar 31, 2025
Procurement Method
Competitive - Open bidding
Selection Criteria
Not applicable
Notice Type
Invitation to Qualify

Classification

UNSPSC Code
72141107; 72141129; 72153700; 72154600
UNSPSC Description
Bridge construction and repair service; Park and garden construction and or remodelling service; Parking facility construction and equipment installation and maintenance and repair services; Animal habitat and enclosure construction and maintenance services

Trade Agreements

Canadian Free Trade Agreement (CFTA)

Contracting Entity

Environment and Climate Change Canada

351. boul. Saint-Joseph

Gatineau, QC

Contact

Shawn Davis

shawn.davis@ec.gc.ca

873500-0215

Regions of Delivery

Ontario (except NCR)