CancelledConstructionAmended (3x)

ST. MARY’S RIVER TOWER REPLACEMENT SAILORS ENCAMPMENT RANGE AND STRIBLING POINT RANGE (LL5414, LL5415, LL5416, LL5417)

REMPLACEMENT DE LA TOUR DE ST. MARY'S RIVER CHAMP DE CAMPEMENT DES MARINS ET CHAMP DE STRIBLING POINT (LL5414, LL5415, LL5416, LL5417)

Description

Work under this Contract includes but is not limited to the provision of all labour, materials, and equipment required to: • Design of four [4] site specific concrete foundations for towers supplied by Canadian Coast Guard (CCG); • Supply and installation of four [4] concrete foundations as approved by CCG; • Installation of CCG supplied towers as per CCG provided drawings; • Demolition of four [4] existing skeleton style towers and concrete foundations. CCG Sailors Encampment and Stribling Point range towers are at the end of their lifecycle and are required to be replaced. Three [3] of the four [4] sites are accessible by land/vehicle and one [1] site is accessible by boat or helicopter. The exact coordinates of the sites are as follows: • Sailors Encampment LL5414 front range tower : 46°15'39.54"N, 84° 5'51.12"W • Sailors Encampment LL5415 rear range tower: 46°15'58.85"N, 84° 5'42.66"W • Stribling Point LL5416 front range tower: 46°18'47.00"N, 84° 6'55.43"W • Stribling Point LL5417 rear range tower: 46°18'37.43"N, 84° 6'13.47"W Under this contract, a site specific concrete foundation shall be designed and stamped by a Professional Engineer practicing within the Province of Ontario. Geotechnical reports and tower drawings will all be provided by CCG to the Contractor to assist in the design the site specific foundations. When the foundation design has been approved by CCG, the Contractor shall construct the foundations and erect CCG supplied ‘Quebec Towers’. Tower heights to be provided will be 40’, 45’, 70’, and 70’. Erection of the towers will also include the installation of their corresponding Daymarks. Daymarks will also be provided by CCG including the drawings of each Daymark to be installed. When new towers have been installed in their entirety, the Contractor shall then demolish the existing towers including their concrete foundations. All enquiries must be submitted in writing to the Contracting Authority no later than seven (7) calendar days before the bid closing date. Enquiries received after that time may not be answered. Work must be completed by February 28, 2025.
✨

Quick Summary

Fisheries and Oceans Canada is seeking a contractor to design and install four concrete foundations and replace four towers at the Sailors Encampment and Stribling Point ranges. The work includes demolition of existing towers and foundations, with three sites accessible by land and one requiring boat or helicopter access. A Professional Engineer licensed in Ontario must design and stamp the foundations.

Ideal For

Companies specializing in civil engineering, concrete foundation construction, and tower installation with experience in remote or marine-accessible sites should bid.

concrete foundation constructiontower installationdemolition servicesmarine infrastructureengineering design
High complexity

Tender Details

Reference Number
cb-867-26621051
Solicitation Number
30005469
Publication Date
May 16, 2024
Closing Date
May 31, 2024
Expected Start
Jul 2, 2024
Expected End
Feb 28, 2025
Procurement Method
Competitive - Open bidding
Selection Criteria
Variations or combinations of the above methods
Notice Type
Invitation to Qualify

Classification

UNSPSC Code
72101704; 72103003; 72130000; 72140000
UNSPSC Description
Foundation or slab work; Demolition services; General building construction; Heavy construction services

Trade Agreements

None

Contracting Entity

FISHERIES AND OCEANS

200 Kent Street

OTTAWA, ON

Contact

PAUL FORTIER

paul.fortier@dfo-mpo.gc.ca

(343) 596-9926

Regions of Delivery

Ottawa; Ontario (except NCR); National Capital Region (NCR); Thunder Bay