ExpiredConstruction

EZ899-250551 Toad River Culvert Outlet Rehabilitation – Km 647.4 Alaska Highway, BC

EZ899-250551 Réhabilitation de la sortie du ponceau de la rivière Toad - Km 647.4 de la route de l'Alaska, C.-B

Description

This project work includes excavation and reinstallation of riprap end protection, willow staking and hydraulic seeding of disturbed areas at the outlet of the culvert crossing site located at Km 647.4 of the Alaska Highway between Fort Nelson and Watson Lake, BC.
✨

Quick Summary

The Department of Public Works and Government Services (PSPC) is seeking services for excavation and reinstallation of riprap end protection, willow staking, and hydraulic seeding at the culvert outlet located at Km 647.4 on the Alaska Highway in British Columbia. The work aims to rehabilitate the culvert crossing site between Fort Nelson and Watson Lake.

Ideal For

Companies specializing in civil construction and environmental rehabilitation with experience in riprap installation and hydraulic seeding should bid.

civil constructionenvironmental restorationerosion controlhighway maintenancelandscaping
Moderate complexity

Tender Details

Reference Number
WS4714413380-Doc4726312618
Solicitation Number
WS4714413380
Publication Date
Aug 7, 2024
Closing Date
Aug 23, 2024
Expected Start
Sep 27, 2024
Procurement Method
Competitive - Open bidding
Selection Criteria
Lowest Price
Notice Type
Invitation to Qualify

Classification

UNSPSC Code
30131514; 81101510
UNSPSC Description
Reinforced concrete built up culvert block; Highway engineering

Trade Agreements

Canadian Free Trade Agreement (CFTA)

Contracting Entity

Department of Public Works and Government Services (PSPC)

11 Laurier St, Phase III, Place du Portage

Gatineau, Quebec

Contact

Ngan, Ken (SPAC/PSPC) (il-lui / he-him)

ken.ngan@tpsgc-pwgsc.gc.ca

Regions of Delivery

Canada; British Columbia